Project overview

Design and construction of the North-South Corridor tunnel between Ang Mo Kio Avenue 3 and Ang Mo Kio Avenue 9. GOOD WAVE E&C PTE. LTD.'s documented package covers temporary works in Zone 3, with a specific focus on steel drain works.

The documented package sits within a major civil infrastructure programme, where temporary works and steel drain works are carried out alongside the wider tunnel construction.

Key scope

  • Temporary works associated with the infrastructure construction programme.
  • Zone 3 steel drain works.
  • Site steelwork activities carried out within an active civil infrastructure environment.

Discuss a work package

For tender submissions, prequalification and business development discussions, contact GOOD WAVE E&C PTE. LTD. by phone.