Contract N110 — North-South Corridor
Client / reference: Lum Chang Building Contractors Pte. Ltd.
Project overview
Design and construction of the North-South Corridor tunnel between Ang Mo Kio Avenue 3 and Ang Mo Kio Avenue 9. GOOD WAVE E&C PTE. LTD.'s documented package covers temporary works in Zone 3, with a specific focus on steel drain works.
The documented package sits within a major civil infrastructure programme, where temporary works and steel drain works are carried out alongside the wider tunnel construction.
Key scope
- Temporary works associated with the infrastructure construction programme.
- Zone 3 steel drain works.
- Site steelwork activities carried out within an active civil infrastructure environment.